Al Methak Bridge

Project Name:- Al Methak Bridge.
Location:-Nasr City.
Project State:-Under Construction.
Cost:- 100 Million EGP.
Systems used:-Precast Beams and Prestressed Beams.
Entities Involved in the Project:-
Implementation and supervision: - Armed Forces Engineering Authority (Department of Military Engineers).
Contractor Consultant: Arab House of Engineering (AHE)
Contractor: El Soadaa Group for Construction and Building (S.G).
Project Description:- The Bridge is Crossing Over Shenzo-Abbe Corridor that Connects Al Mosheer Corridor With Al Suez Freeway. 

Al Methak Bridge

AHE